Q
QuantAbundance
4 min read

TeraWulf (WULF) Q3 2026: HPC lease revenue doubles to $63M, 83% of revenue, CB-4 rent due this quarter

TeraWulf posted revenue of $76.2M, of which $63.0M of HPC lease revenue, with 102 MW earning rent and 336 MW under construction. Net income of $709.9M came from a non-cash warrant gain; Adjusted EBITDA was minus $12.8M.

WULFTeraWulfEarningsQ3 2026AI Data CentersHPCBitcoin Miners

$WULF reported revenue of $76.2M for the third quarter, against $50.6M a year ago, and the mix has turned over: $63.0M came from high performance computing (HPC) leases at Lake Mariner, about 83% of the total, against $31.9M in the second quarter. Bitcoin mining brought in $13.2M. The headline net income of $709.9M is an accounting line: it rests on a $728.4M non-cash gain on the fair value of warrants, and diluted earnings per share were minus $0.03. This recap walks the print, the build, the balance sheet and the read across the Cooling / DC Infra bubble.

The TL;DR. 102 MW of critical IT earned rent at quarter end, with CB-4 and CB-5 (336 MW) under construction: CB-4 rent starts in phases this quarter, CB-5 in early 2027. Justified now has its Anthropic lease (about 401 MW, about $19B over 20 years per the company), a Google credit backstop for the project financing and a Fluor construction contract. Adjusted EBITDA was minus $12.8M, interest expense $53.6M.

This recap is drawn from the earnings release (8-K exhibit 99.1) filed on November 6, 2026 before the 8:00 a.m. Eastern Time call. The call and the 10-Q are not covered here.

The print

$WULF reported the quarter ended September 30, 2026.

MetricQ3 2026Q3 2025Change
HPC lease revenue$63.0M$7.2Mx8.7
Digital asset (mining) revenue$13.2M$43.4M-69%
Total revenue$76.2M$50.6M+51%
Operating expenses$37.7M$2.9M+$34.8M
SG&A$56.8M$16.6M+$40.2M
Operating loss-$88.2M-$24.7Mwider
Interest expense$53.6M$9.8Mx5.4
Change in fair value of warrants and derivatives+$728.4M-$424.6Mnon-cash
Net income (loss)$709.9M-$455.1M
EPS, basic / diluted$1.42 / -$0.03-$1.13
Adjusted EBITDA (company)-$12.8M

What moved the numbers:

  • HPC leases. Fluidstack and Core42 capacity at Lake Mariner earning rent: HPC revenue roughly doubled from the second quarter's $31.9M.
  • Mining. Down to $13.2M as mining infrastructure is repurposed for HPC, by design.
  • Costs. Operating expenses and SG&A rose with the data center operations; interest expense rose with the $3.2B of secured notes and the convertibles.
  • Warrants. A $728.4M gain on the fair value of the warrant liabilities, the reverse of the $424.6M loss a year ago. It moves with the share price and carries no cash.
  • Abernathy. A $95.0M gain on the sale of the 50.1% stake in the Abernathy joint venture.

The build

CampusStatus per the release
Lake Mariner (New York)102 MW earning rent; CB-4 and CB-5, 336 MW, under construction within $8M to $10M per critical IT MW
Justified (Kentucky)Anthropic, about 401 MW, 20 years, about $19B; Google credit backstop and Fluor EPC; ready for service from late 2027 to Q2 2028
Muskie (Kentucky)Contracted power raised from 500 MW to 1,000 MW, subject to the Kentucky Public Service Commission; second 500 MW phase moved forward to 2029
  • Growth target reaffirmed: 250 MW to 500 MW of new critical IT capacity contracted each year.

The balance sheet

Sept. 30, 2026Dec. 31, 2025
Cash and restricted cash$2.36B$3.72B
Property, plant and equipment, net$4.58B$1.51B
Long-term debt$3.03B$3.05B
Convertible notes (short and long term)$2.12B$2.07B
Warrant liabilities$1.09B$0.84B
Shares outstanding501.4M420.1M
  • Capex. $2.23B spent on plant and equipment over nine months.
  • Funding. $1.20B of new shares sold this year; outstanding shares up 19% since December.
  • After the quarter. The revolver went from $250M to $400M, with a $150M uncommitted accordion. Abernathy still owes $150M by December 31, 2026 and about $130M by April 30, 2027.

Cooling / DC Infra read-through

The standing QA thesis on /stocks/wulf: a bitcoin miner turned AI data center landlord, about 840 MW of critical IT under lease, with concentration, leverage and dilution as the bear case.

  • Revenue flip. Confirmed and faster: 83% HPC, up from about 71% in the second quarter.
  • Delivery. On schedule per the company: CB-4 rent this quarter, CB-5 in early 2027, Justified financing structured.
  • Leverage and dilution. Still the open side: interest expense of $53.6M against $63.0M of HPC rent, 19% more shares since December, and a warrant liability above $1B.

Net read: the lease book is turning into rent; the balance sheet still carries the cost of building it.

Peer reaction

$WULF's closest correlated names in the QA universe over 252 days are $CIFR (0.85), $CORZ (0.84), $APLD (0.79), $HUT (0.78) and $IREN (0.76). Core Scientific and IREN reported on November 5. The release came before the open on November 6; the session reaction was not established when this recap was written.

What worked

  • HPC lease revenue of $63.0M, about double the second quarter.
  • Justified financed and contracted: Google backstop, Fluor EPC, Anthropic lease.
  • Muskie power doubled to 1 GW, pending state approval.

What broke

  • Adjusted EBITDA of minus $12.8M, and an operating loss of $88.2M.
  • Interest of $53.6M a quarter.
  • Dilution. 501.4M shares outstanding, from 420.1M in December.
  • The tape. A $10.08 close on November 5 before the release, down 26% over a month and 38% over three months in the data QA tracks.

What to watch

  • CB-4 rent commencement in the fourth quarter, the next step up in HPC revenue.
  • The Justified project financing closing under the Google backstop.
  • The Kentucky Public Service Commission decision on Muskie.
  • A new lease inside the 250 MW to 500 MW yearly target.
  • Levels. The nearest auto Fibonacci retracement of the 52-week range sits at $13.86, above the November 5 close; there is no curated level on WULF.

The level map, the peer table and the standing thesis live on /stocks/wulf, where our TeraWulf teardown video is embedded, with the company primer in TeraWulf explained. The full $WULF dossier collects the filings and the numbers. To follow the AI data center builders as a group, see the Cooling / DC Infra bubble.


Educational research on structural market dynamics. Not investment advice. QuantAbundance positions may change without notice.

The full dossier

Included in Pro

The WULF teardown in writing, its SEC filings in one table, peers with numbers and the live level map, in one read.

See the dossier

Related bubbles

Related research

Go deeper

Want more of these in your Google results? Add QuantAbundance as a preferred source.

Add to Preferred Sources