We use Google Analytics to count anonymous page views and understand which content gets read. No ads, no profiles. Decline keeps you on cookieless mode. Details.
Argan, Inc.
Industrials · Construction & Engineering
Structural: pure-play EPC on US gas-fired power buildout. Hyperscaler datacenter load is forcing utilities to add dispatchable baseload faster than nuclear/SMR can deliver - gas combined-cycle is the 2026-2030 bridge. Gemma is one of a handful of qualified EPCs (alongside $PWR Quanta, $MTZ MasTec, Bechtel) and runs lean (no merchant exposure, paid against contracted milestones).
- Backlog above $1B and rising as datacenter PPAs trigger new CCGT awards
- Net cash balance sheet (~$500M+ cash, no debt); EPC capex-light vs IPP peers
- Pricing power: skilled-labor and gas-turbine ($GE Vernova) supply constraints let EPCs reprice
- APC Ireland leg captures EU datacenter buildout (Dublin power crunch)
- Microcap with no sell-side coverage - re-rating optionality if power-thesis names sweep in
- Lumpy revenue: single project slip can swing a quarter 20%+
- Customer concentration (top 3 IPP/utility clients regularly >60% of revenue)
- Gas-turbine lead times now 3-4 yrs ($GEV backlog) - could delay new project starts
- Carbon policy / IRA reversal risk if gas CCGT permitting tightens
- No moat vs $PWR $MTZ on large jobs; wins on price discipline and execution speed
Each weekday: the scan's ENTER setups with entry, stop and target, every new ticker teardown, and the bubble shifts that move names like this one. Free. Education, not advice.
No spam. One email per day max. Pro adds Telegram trade alerts and higher AI-assistant limits.
No major news in the last 7 days for ARGN - only listicles and opinion pieces, which we filter out by default. See everything anyway.
No key levels recorded for this ticker.