We use Google Analytics to count anonymous page views and understand which content gets read. No ads, no profiles. Decline keeps you on cookieless mode. Details.
Xcel Energy Inc.
Utilities · Electric Utilities
5% allowed ROE. $45B 2025-2029 capex plan (transmission, generation replacement, grid hardening) drives ~7% rate base CAGR - mechanical EPS growth as long as regulators approve recovery. Front Range (CO) and Twin Cities (MN) sit in two of the most aggressive data center expansion corridors ex-Virginia; large-load tariffs being filed to capture hyperscaler demand without subsidizing it from residential.
6-8% EPS CAGR guide backed by transparent capex schedule; data center load could push above guide if $META/$MSFT/$GOOGL CO buildouts land in rate base; wind PTC tailwind on legacy fleet; Marshall Fire wildfire liability resolved 2025; constructive CO/MN commissions historically.
rising rate environment compresses utility multiples (P/E historically 18-20× compresses to 14-16×); wildfire risk overhang (CO regulator inverse-condemnation exposure even post-Marshall); coal retirements (Comanche 3 by 2031) front-loaded capex without immediate revenue; regulatory lag on data center large-load tariffs if CO PUC drags; balance sheet stretched - equity issuance needed to fund capex dilutes EPS.
Each weekday: the scan's ENTER setups with entry, stop and target, every new ticker teardown, and the bubble shifts that move names like this one. Free. Education, not advice.
No spam. One email per day max. Pro adds Telegram trade alerts and higher AI-assistant limits.
Auto-computed retracement of the trailing 52w low-high leg. Recomputed on each refresh; not a curated level.
Auto-computed retracement of the trailing 52w low-high leg. Recomputed on each refresh; not a curated level.
Auto-computed retracement of the trailing 52w low-high leg. Recomputed on each refresh; not a curated level.