Fermi America wants to be the landlord and the power company for AI data centers. It leases a very large site in Texas, plans to generate its own electricity there, and intends to rent the powered land to the companies that run AI computing. That is what it does, or more exactly what it plans to do: there is no tenant lease in force and no revenue yet.
The standard $FRMI line is "a nuclear and AI power stock". The filings describe something more specific: a development project that has spent well over a billion dollars on land, turbines and permits, and whose next steps depend on one signed lease. This piece walks through what Fermi is building, how it would make money, why three tenant deals have not produced a lease, and what to watch next. Company figures are from the 10-Q for the period ended 2026-09-30, filed on 2026-11-12, and the 8-K of 2026-11-23; prices are as of 2026-11-25 unless noted.
The TL;DR. Fermi America is a pre-revenue project: land, permits and gas turbines for an AI power campus, financed mostly with debt. The single frame that matters: everything turns on a first signed tenant lease, and the land lease itself sets a date for it, December 31, 2026.

What does Fermi America do?
Fermi Inc., which trades as Fermi America, listed on the Nasdaq on 2025-10-01. Four pieces matter to an investor.
- The site. Project Matador, near Amarillo, Texas: about 5,200 acres leased from Texas Tech for 99 years.
- The power plan. A private grid of about 11 gigawatts on paper, of which about six are permitted today, from gas turbines, solar, batteries and four nuclear reactors. The IPO plan called for 1.1 gigawatts by the end of 2026.
- The near term. Natural gas: Siemens turbines, plus about 200 megawatts from the local utility.
- The nuclear part. In June 2025 Fermi asked the Nuclear Regulatory Commission for a license to build four Westinghouse AP1000 reactors, about 4 gigawatts. The commission published its draft environmental review in October 2026. The plan now starts one reactor a year, from 2034 to 2037; the first one slipped a year.
Former Texas governor Rick Perry is a co-founder. Since August 2026 the chief executive is Lee McIntire, who used to run TerraPower.
How Fermi America plans to make money
The model is a landlord's: tenants sign long leases for powered land, and Fermi collects rent and power payments. The one lease it has signed shows the scale it is aiming for: TensorWave, an AI cloud, agreed in August 2026 to 15 years and 222 megawatts, worth about $6.5 billion over its life. That lease never closed.
Until a lease is in force, the income statement has costs only. From the SEC filings:
| Q3 2026 | Nine months 2026 | |
|---|---|---|
| Revenue | none | none |
| Operating loss | $142.2M | $335.2M |
| Net loss | $141.6M | $356.1M |
| Cash used in operations | $54.5M | $110.5M |
| Spending on plant and equipment | $133.4M | $759.6M |
Over the last four quarters, operating cash flow minus capital spending was about minus $1.37 billion. That money went into the site and the equipment, and it was financed with the IPO proceeds and with debt.
The missing piece: a tenant
Three tenant deals in about fourteen months, and none in force today.
- September 2025. A letter of intent with a first tenant, then a $150 million advance agreement. On 2025-12-11 that tenant ended the advance agreement before a dollar was drawn, and no lease followed. The stock fell 34% the next day.
- August 2026. The TensorWave lease: signed, never closed, terminated on 2026-11-10.
- November 10, 2026. A new letter of intent with an investment grade hyperscaler, for about 600 megawatts of powered land, with a $200 million prepayment agreement and a $15 million early construction agreement around it. The filing calls the letter non-binding.
One update since: on 2026-11-23 Fermi reported in an 8-K that the obligations under the customer prepay agreement had been fulfilled and the amounts due had been funded to the company. The 8-K does not state the amount, and a funded prepayment is not a signed lease.
The December 31 deadline
Under the Texas Tech lease, Fermi needs a notice to proceed by 2026-12-31. That notice requires a signed lease with a first tenant of at least 200 megawatts. Without it, the university may terminate the land lease. Fermi says it is discussing an extension. The same date can force early repayment of an equipment loan, and by 2027-02-10 a turbine loan needs fully committed financing for the first phase.
The 10-Q for the third quarter flags substantial doubt about the company's ability to continue as a going concern; management says its plans resolve it.
Where it sits
$FRMI sits in two QA themes: AI Power and Nuclear. On price, it moves more with the companies that already sell power and space to AI than with reactor developers. Over 252 trading days, its tightest correlations in the QA universe include Core Scientific ($CORZ, 0.49), TeraWulf ($WULF, 0.48), CoreWeave ($CRWV, 0.47) and Oklo ($OKLO, 0.47). None of these is tight: a correlation under 0.5 says the stock mostly trades on its own news. The difference with the first three is simple: they have signed tenants and revenue, and Fermi does not yet. The daily-refreshed peer table is on /stocks/frmi.
The numbers
| Close, 2026-11-25 | about $2.00 |
| IPO price (2025-10-01) | $21.00 |
| First-day close (2025-10-01) | $32.53 |
| Lowest close since the IPO (2026-11-05) | $1.53 |
| Market cap (QA data) | about $1.3B |
| Revenue | none |
| Net loss, Q3 2026 | $141.6M |
| Cash and equivalents, 2026-09-30 | $286.3M ($315M with restricted cash) |
| Debt (book), 2026-09-30 | $958.4M, of which $431M convertible notes |
| Shares outstanding | about 647 million |
The share count matters here. The diluted count went from 73.7 million in the first quarter of 2025 to 642.7 million in the third quarter of 2026, and the convertible notes can add more.
The bull case
- The hard-to-copy assets exist. The land and the water leases are signed, about six gigawatts are permitted, and Fermi holds gas turbines.
- The nuclear review is moving. The draft environmental review for four AP1000 units was published in October 2026.
- A large customer is at the table. An investment grade hyperscaler signed a letter for about 600 megawatts, and the related prepayment was funded on 2026-11-23.
- New management. A chief executive with nuclear project experience, named in August 2026.
The bear case
- No lease. Three tenant deals, one signed lease, none in force. The current letter is non-binding.
- The calendar. The Texas Tech notice to proceed is due on 2026-12-31, with loan conditions tied to that date and to 2027-02-10.
- The balance sheet. Debt is about three times the cash, the quarterly report carries a going concern warning, and new capital could mean more shares.
- Governance. In April 2026 the board removed the co-founder chief executive, later fired him for cause, and he is suing. In October 2026 Rick Perry missed the share majority the bylaws require and stays as a holdover director.
- Nuclear is far away. The first reactor is planned for 2034, and it needs a license, financing and construction first.
How to access
$FRMI trades on the Nasdaq. No ETF holding is on file for it in the QA database today, so exposure is the stock itself. The brokers we use are on /stack.
The full teardown video is on /stocks/frmi. The desk's full read in one document, with seven quarters of SEC filings and the level map, is the Fermi Teardown Dossier, included in /pro, along with rule-based alerts on $FRMI.
What to watch
- A signed lease. An 8-K announcing a definitive lease with a first tenant of at least 200 megawatts, or the letter of intent lapsing.
- Texas Tech. A notice to proceed by 2026-12-31, or an announced extension of that date.
- Financing. Committed first-phase financing before 2027-02-10, and its form: debt, equity or convertible notes.
- Cash. The year-end balance against $286.3M, and whether the going concern language stays in the annual report.
- The nuclear license. The final environmental review and the commission's schedule for the four units.
- Next earnings. The fourth quarter and full year 2026; last year's annual report was filed on March 30 (date not yet confirmed by the company).
- Observable reference levels. $1.53, the lowest close since the IPO, and $3.34, the 50-day average on 2026-11-19. These are observable reference levels, not trade levels or targets. The live level map is on /stocks/frmi.
Live data on this ticker: /stocks/frmi. Price, ETF holdings, correlations, the level map, bot positions.
QuantAbundance is educational research. Nothing here is investment advice. See /disclosures.
The full dossier
Included in ProThe FRMI teardown in writing, its SEC filings in one table, peers with numbers and the live level map, in one read.
See the dossierFrequently asked questions
- What does Fermi America do?
- Fermi America (Fermi Inc., ticker FRMI) is developing Project Matador, a private power and data center campus on about 5,200 acres leased from Texas Tech near Amarillo, Texas. The plan is to generate power on site with gas turbines, solar, batteries and, later, four nuclear reactors, and to lease powered land to AI data center companies. It has no tenant lease in force and no revenue yet.
- How does Fermi America make money?
- Today it does not: its SEC filings show no revenue. The plan is to earn rent and power payments from data center tenants under long leases. In the third quarter of 2026 it lost $141.6 million, and over the last four quarters it spent about $1.37 billion more cash than it took in from operations.
- Does Fermi America have a tenant?
- Not under a signed lease as of late November 2026. A first tenant ended its $150 million advance agreement in December 2025, and a 222 megawatt lease with TensorWave, signed in August 2026, was terminated on November 10, 2026. The same day Fermi signed a non-binding letter of intent with an investment grade hyperscaler for about 600 megawatts, and on November 23 it reported that the related customer prepayment had been funded.
- What is the December 31 deadline for Fermi America?
- Under its lease with Texas Tech, Fermi needs a notice to proceed by December 31, 2026, which requires a signed lease with a first tenant of at least 200 megawatts. Without it, the university may terminate the land lease. Fermi says it is discussing an extension.
- Is Fermi America a nuclear stock?
- Partly, and not soon. In June 2025 it applied to the Nuclear Regulatory Commission for a license to build four Westinghouse AP1000 reactors, about 4 gigawatts. Its plan starts one reactor a year from 2034 to 2037. The near-term power is natural gas.
The desk behind this piece
Some of these are affiliate relationships. See disclosures.
Related research
- 9 min readWhat Does NuScale (SMR) Do? The Only NRC-Approved SMR Design
- 12 min readWhat Does Oklo (OKLO) Do? It Sells Power, Not Reactors
- 6 min readCommonwealth Fusion Systems Stock: Is CFS Public? What Investors Can Own
- 5 min readConstellation Energy (CEG) Q3 2026: adjusted EPS $5.06, 2026 guide raised to $12.50 to $12.80, Google and Amazon nuclear deals
Go deeper
Want more of these in your Google results? Add QuantAbundance as a preferred source.
Add to Preferred SourcesFollow $FRMI for free.
One email a day: the AI-trade watchlist, every new ticker teardown and the cluster shifts. Free, leave in one click.
Free when you join: the $HOOD Teardown Dossier (Robinhood Markets), the full desk file we sell in the shop. One per new reader.
No spam. One email per day max, unsubscribe in one click. Pro ($49/mo) includes every dossier and report in the shop.