Nuclear

Reactors, SMRs, uranium miners and enrichment.

0.595avg corr (252d)
15stocks
Decent co-movement

Stocks · key Fib levels

  • BWX Technologies: builds the reactors of the US Navy, makes nuclear fuel and components, and is building a microreactor for the Department of Defense (Project Pele).

    $8.4B backloganchored by US Navy · DOE / NNSA · Commercial nuclear utilities and reactor developers
    • US Navy, naval nuclear propulsion: sole supplier of reactors and fuel for Virginia and Columbia class submarines and Ford class carriers (Government Operations, $601.3M Q2 2026 revenue)
    • DOE / NNSA: uranium processing and nuclear materials work inside Government Operations
    • Precision Components Group: acquisition closed 2026-07-01, heavy-walled and heat-transfer components for commercial nuclear (10-Q)
    • Kinectrics: acquired 2025-05-20 for CAD 782.7M, commercial reactor services (Commercial Operations)
    • Medical business sale: definitive agreement 2026-07-31 with Nordic Capital, up to $800M, BWXT keeps a minority interest (10-Q)
  • CCJ
    $71.30last
    - fib

    Cameco: one of the largest uranium producers (McArthur River and Cigar Lake in Saskatchewan) and owner of 49 % of Westinghouse, the reactor designer, with Brookfield.

    anchored by US utilities · European utilities · Asian utilities (Korea, Japan) · DOE strategic reserve · Westinghouse customers
    • 2022 - McArthur River restart at planned capacity
    • 2023 - Westinghouse 49% acquisition closed (Brookfield + Cameco)
    • 2024-2025 - Multi-year supply contracts signed with US + EU utilities at elevated prices
    • 2025 - Long-term contract book extended; new-reactor optionality via Westinghouse
    • 2026 - DOE HALEU + commercial fuel contracts
  • Constellation Energy: the largest nuclear fleet in the US, restarting Three Mile Island Unit 1 (Crane Clean Energy Center) to supply Microsoft.

    anchored by META
    • 20-year PPA with Meta: 1.1 GW of nuclear power in Illinois, starting 2027
    • Powering Meta's AI data center expansion through 2046+
    • Nuclear baseload is the only credible "always-on" AI power source at scale
    • Convergent with the broader datacenter-power thesis (VST, NEE, GEV all signing similar)
  • DNN
    $2.19last
    - fib

    Denison Mines: building Phoenix, an in-situ recovery uranium mine at Wheeler River in the Athabasca Basin, Saskatchewan.

    anchored by Cameco (CCJ) - McClean Lake toll-milling counterparty · Orano - McClean Lake JV operator + processing partner · Undisclosed US utility (2023 long-term U3O8 offtake)
    • 2025-08-15 - US$345M of 4.25% convertible senior notes due 2031-09-15 closed; 342.9355 shares per US$1,000 (~US$2.92 per share). Proceeds earmarked for Phoenix.
    • 2026-01-02 - Phoenix capital cost update: initial capex C$600M (Class 2) vs C$419.4M in the 2023 feasibility study (C$500.5M in 2026 dollars); contingency C$65M. Base case after-tax NPV8 C$1.57B, IRR 73%, payback ~12 months.
    • 2026-02-24 - Final investment decision after the CNSC construction licence (February 2026); construction from March, ~24 months; first production guided mid-2028.
    • Benefit agreements in place: Impact Benefit Agreement with Métis Nation-Saskatchewan; Nuhenéné Benefit Agreement with three First Nations and four municipalities.
    • 2026-08-12 - Q2 2026: 750,000 lb of U3O8 sold at US$89.17/lb (US$66.9M, realized gain C$64.1M); over 20% of site civil work done by end of July; Phase 1 freeze wall installation started.
    • 2026-08-12 - Uranium book: ~1.1M lb held at 2026-06-30 (950,000 lb physical + 145,926 lb McClean concentrates); 600,000 lb committed Q3 2026 to Q2 2027, of which 350,000 lb fixed at a US$95.17/lb average (US$33.3M); ~500,000 lb uncommitted.
    • 2026-06-30 - Cash and cash equivalents C$465.3M (C$465.9M at 2025-12-31).
    • McClean Lake JV: Denison 22.5%, Orano operator.
  • GEV
    $774.11last
    $867.00fib

    GE Vernova: with Hitachi, designs the BWRX-300 small modular reactor, the first of which is being built at Darlington, Ontario.

    anchored by TVA · Ontario Power Generation · xAI · undisclosed hyperscaler PPAs · utility grid operators (global)
    • Gas turbine OEM with active datacenter PPA-tied contracts
    • Grid equipment (transformers, HV switchgear) - long lead times = pricing power
    • Nuclear services franchise (BWRX-300 SMR + existing-fleet maintenance)
    • Capacity backlog stretching multiple years given hyperscaler-driven demand
  • LEU
    $104.60last
    $183.00fib

    Centrus Energy: US uranium enrichment, the only US producer of HALEU fuel for advanced reactors (Piketon, Ohio).

    anchored by DOE · US utilities (LEU contracts) · SMR developers (Oklo, NuScale, X-energy, TerraPower)
    • DOE HALEU contract: $900M firm fixed price, signed 2026-07-01 (announced 2026-01-05); first delivery of 1 tonne by July 2032, two DOE options of 5 tonnes each at $17M per tonne
    • DOE demonstration cascade (Piketon): HALEU production ended mid-June 2026; maintenance and storage to 2026-09-30; DOE not exercising further options (10-Q, 2026-08-06)
    • X-energy: LEU and HALEU supply, deliveries from 2030 (8-K 2026-08-06)
    • Radiant Industries: HALEU supply contract (8-K 2026-09-09); Antares Nuclear: HALEU supply contract (8-K 2026-09-17)
    • Equity raise: ~$500M at $199.64 with pre-funded and common warrants (priced 2026-09-09)
    • Q2 2026: revenue $176.1M (+14%), backlog $4.5B to 2040; 2026 guide revenue $450M to $500M (8-K 2026-08-05)
  • Lightbridge: develops a metallic nuclear fuel for existing reactors and small modular reactors, samples under irradiation at Idaho National Laboratory; pre-revenue.

    • 2022 : agreements with Battelle Energy Alliance (operator of Idaho National Laboratory) to develop Lightbridge Fuel; extended in March 2026 through September 2032
    • 2025-11 : fuel material coupon samples inserted into the Advanced Test Reactor at INL (milestone certified by the compensation committee)
    • 2026-H1 : $44.4M net raised through the at-the-market program (about 3.8M shares); about $96.1M left of the $150M program at 2026-06-30
    • 2026-06-30 : cash and equivalents $237.5M, no debt; Q2 net loss $5.8M, interest income $1.9M
    • 2026-08-06 : equity awards tied to a pilot-scale fuel fabrication facility and a first complete lead test assembly (deadlines 2029 to 2034); Andrey Mushakov named EVP and COO
    • 2026-08-24 : selected for the DOE Nuclear Energy Launch Pad program (National Reactor Innovation Center at INL)
  • Nano Nuclear Energy: developing portable microreactors (KRONOS, ZEUS); pre-revenue.

    anchored by US Department of Energy (R&D voucher) · US Department of Defense (microreactor RFI participant) · University of Illinois Urbana-Champaign (research-reactor MOU)
    • 2024-09: Acquired ALIP liquid-metal pump technology from European consortium - used in fast-spectrum reactor coolant loops.
    • 2024-11: NRC pre-application engagement initiated for ZEUS microreactor design.
    • 2025-02: MOU with University of Illinois Urbana-Champaign for ODIN research-reactor siting study.
    • 2025-05: DOE Voucher Program selection for HALEU transport cask development (sub-$1M, R&D scope).
    • 2025-09: Strategic agreement with $LEU (Centrus Energy) for HALEU fuel supply discussions - non-binding LOI.
    • Status as of 2026-06-01: no construction permit, no commercial reactor sale, no recurring revenue line.
  • NXE
    $8.25last
    - fib

    NexGen Energy: developing Rook I (the Arrow deposit) in the Athabasca Basin, Saskatchewan, one of the largest undeveloped uranium deposits.

    anchored by Western utility offtake (pending) · US/EU nuclear fuel buyers · Uranium ETFs ($URA, $URNM)
    • Rook I / Arrow deposit - 100%-owned flagship; feasibility study confirms one of largest high-grade undeveloped uranium projects globally (Athabasca Basin, Saskatchewan)
    • CNSC federal licensing - Canadian Nuclear Safety Commission environmental assessment + license-to-construct process is the gating catalyst
    • Uranium inventory - accumulated ~2.7Mlb physical U3O8 as treasury / financing optionality
    • Strategic equity - IsoEnergy / cross-shareholding positions across Athabasca exploration peers
    • Dual listing - TSX: NXE.TO and NYSE: NXE; included in $URA and $URNM uranium ETF baskets
  • OKLO
    $23.55last
    $69.00fib

    Oklo: developing the Aurora powerhouse, a fast microreactor sold as power under long-term contracts; pre-revenue.

    anchored by DOE (Idaho National Laboratory) · Datacenter operators (undisclosed LOIs) · Industrial / remote site operators
    • 2024 - DOE Idaho National Laboratory site approval for first Aurora reactor
    • 2024 - Multiple LOIs / framework agreements with datacenter operators (specific terms undisclosed)
    • 2025 - NRC combined-license application progressing; site characterization complete at INL
    • 2025-2026 - Pre-construction engineering for first commercial Aurora units
    • Late-2020s targeted - First Aurora commercial operation
  • NuScale Power: small modular reactor developer, the first SMR design approved by the US Nuclear Regulatory Commission.

    anchored by ENTRA1 Energy (exclusive commercialization partner) · TVA (6 GW program, PPA under discussion) · RoPower Nuclear (Romania)
    • 2020-08 - NRC design approval of the original 50 MWe US600 design (certified 2023)
    • 2023-11 - UAMPS Carbon Free Power Project cancelled on cost escalation
    • 2025-05 - NRC Standard Design Approval of the uprated US460 (77 MWe modules, 462 MWe 6-module plant)
    • 2025-09 - ENTRA1 Energy and TVA announce a program for up to 6 GW of NuScale plants (no PPA signed as of Q2 2026)
    • 2025-Q4 - RoPower (Doicesti, Romania, 6 modules) FEED Phase 2 completed; $507.4M milestone payment to ENTRA1
    • 2026-04 - Fluor completes the sale of its entire NuScale stake (~$2.4B of proceeds)
    • 2026-Q2 - Paragon contract to complete the HIPS safety-system design for the power module
    • 2026-09-11 - UBS downgrade to Sell, target $6; law-firm investigations follow
  • Talen Energy: owns the Susquehanna nuclear plant in Pennsylvania, which supplies an Amazon data-centre campus beside it.

    anchored by Amazon Web Services · PJM Interconnection
    • Mar 2024 - Sold Cumulus datacenter campus to $AMZN AWS for $650M cash; signed behind-the-meter PPA to supply up to 960MW initially, escalating to 1.92GW over 10 years
    • Apr 2025 - FERC rejected the ISA amendment for the AWS co-location structure (2-1 vote), creating ~12-month overhang
    • Mar 2026 - FERC approved revised settlement framework allowing co-located load to ramp; restored full economic path for the AWS deal
    • 2024-2026 - ~$3B+ cumulative buyback authorization; share count reduced ~10% from IPO base
    • Susquehanna NRC operating licenses extended through 2042 (Unit 1) and 2044 (Unit 2)
  • Uranium Energy Corp: US in-situ recovery uranium producer with hubs in Texas and Wyoming, plus a physical uranium inventory.

    anchored by US Department of Energy (Strategic Uranium Reserve) · ConverDyn (UF6 conversion) · undisclosed US nuclear utilities (long-term offtake)
    • 2024-12: Sold 300,000 lbs U3O8 to US DOE Strategic Uranium Reserve at ~$70/lb.
    • 2025-08: Restarted production at Christensen Ranch (Wyoming) ISR hub - first yellowcake drums shipped to ConverDyn.
    • 2024-11: Acquired Rio Tinto's Roughrider uranium project (Athabasca Basin, Canada) for $150M - adds conventional resource optionality.
    • 2022-2024: Built ~1.36M lb physical U3O8 inventory via spot purchases at $40-50/lb cost basis.
    • 2025: Hobson (TX) central processing facility on care-and-maintenance pending Burke Hollow + Goliad satellite restart approvals.
  • UUUU
    $6.66last
    $20.00fib

    Energy Fuels: US uranium producer around the White Mesa Mill in Utah, which also separates rare earths.

    anchored by US nuclear utilities (undisclosed) · US Department of Energy · Neo Performance Materials
    • 2022-2025: Multi-year uranium sales contracts with undisclosed US nuclear utilities at above-spot fixed prices; contract book provides revenue visibility through 2030
    • 2023: US Department of Energy Uranium Reserve purchase - UUUU among initial domestic suppliers selected for strategic stockpile
    • 2023-2024: Rare-earth carbonate supply agreement with Neo Performance Materials for processing of White Mesa REE product
    • 2024: Expanded REE processing at White Mesa following receipt of monazite sand feed from third-party sources (Chemours, Donald rare-earth project)
    • 2025 : $700M of 0.75% Convertible Senior Notes due 2031-11-01 (49.1672 shares per $1,000, about $20.34 a share)
    • 2026-01-21 : agreement to acquire Australian Strategic Materials (0.053 Energy Fuels share plus A$0.13 cash per ASM share)
    • 2026-06-23 : agreement to acquire Vacuumschmelze (Germany, magnets) for about $718.0M cash plus 65.85M new shares, about $1.9B implied equity value; closing expected as early as Q1 2027, subject to regulatory and exchange approvals
    • Q2 2026 (to 2026-06-30) : revenue $25.1M (Q2 2025: $4.2M); 310,000 lb of uranium sold at an average $80.48/lb; costs applicable to revenue $10.7M; net loss $33.6M including $10.7M of transaction and integration costs; cash $58.4M plus $903.2M of marketable securities; working capital about $996M (10-Q filed 2026-08-05)
    • 2026 guidance : uranium sales of 1.5M to 2.0M lb
    • 2026-08-28 : ASM acquisition completed, about $243.4M ($217.2M in shares, $26.2M in cash); 14,808,572 new shares issued (8-K filed 2026-08-28)
    • Projects (2026-06-30) : Donald (Australia) JV interest 12.7%, fully permitted, no final investment decision; Vara Mada (Madagascar) and Bahia (Brazil) in permitting or exploration
    • Share count : 249,965,000 shares on the 10-Q cover (2026-07-31), plus 14,808,572 issued for ASM
  • VST
    $124.80last
    $140.00fib

    Vistra: one of the largest US nuclear fleets (Comanche Peak plus the Energy Harbor plants), selling power to data centres.

    50.0 GWanchored by Meta · Helix Digital Infrastructure (KKR / NVIDIA / KIA) · Hyperscalers (undisclosed)
    • 2026-01-09 - 20-year PPAs with Meta for 2,609 MW of carbon-free nuclear from the PJM fleet: 1,268 MW Perry and 908 MW Davis-Besse operating (2,176 MW), plus uprates of 213 MW Perry, 80 MW Davis-Besse and 140 MW Beaver Valley (433 MW)
    • Delivery schedule - part of the operating volume from late 2026, full operating delivery by year-end 2027; uprate volumes from 2031, full by year-end 2034. Largest nuclear uprates supported by a corporate customer in the US
    • 2026-06-11 - Helix Digital Infrastructure launched by KKR with the Kuwait Investment Authority and NVIDIA, more than $10B of long-duration capital commitments, led by former AWS CEO Adam Selipsky. Vistra named preferred power provider
    • Cogentrix acquisition - 10 gas-fired plants, about 5.5 GW, $4B, lifting the portfolio toward ~50 GW across 18 states
    • Nuclear fleet - 6,448 MW: Comanche Peak (TX) plus the four former Energy Harbor reactors (Perry, Davis-Besse, Beaver Valley 1 and 2) in OH and PA. Second-largest competitive nuclear fleet in the US
    • Retail - TXU Energy and Dynegy serve about 5M customers, matching wholesale length against a retail book
    • Q2 2026 (reported 2026-08-07) - adjusted EBITDA $1.767B, up 30% year over year; FY2026 guidance reaffirmed at $6.8B to $7.6B adjusted EBITDA

Co-movement matrix (252d)

BWXT
CCJ
CEG
DNN
GEV
LEU
LTBR
NNE
NXE
OKLO
SMR
TLN
UEC
UUUU
VST
BWXT·0.620.470.520.570.570.590.520.510.560.520.540.540.550.55
CCJ0.62·0.430.860.470.690.740.650.870.700.660.460.810.810.42
CEG0.470.43·0.360.410.420.430.340.370.410.360.800.390.350.80
DNN0.520.860.36·0.410.700.750.670.890.710.680.420.820.830.40
GEV0.570.470.410.41·0.450.490.450.430.430.420.500.390.450.46
LEU0.570.690.420.700.45·0.780.740.690.800.770.450.710.700.46
LTBR0.590.740.430.750.490.78·0.810.760.820.820.520.780.780.47
NNE0.520.650.340.670.450.740.81·0.670.830.830.440.710.690.39
NXE0.510.870.370.890.430.690.760.67·0.700.680.440.820.820.39
OKLO0.560.700.410.710.430.800.820.830.70·0.870.470.730.740.45
SMR0.520.660.360.680.420.770.820.830.680.87·0.420.730.720.39
TLN0.540.460.800.420.500.450.520.440.440.470.42·0.450.390.82
UEC0.540.810.390.820.390.710.780.710.820.730.730.45·0.830.45
UUUU0.550.810.350.830.450.700.780.690.820.740.720.390.83·0.34
VST0.550.420.800.400.460.460.470.390.390.450.390.820.450.34·

Related research

Frequently asked questions

What are the top stocks in the Nuclear theme?
QuantAbundance's Nuclear theme tracks 15 stocks ranked editorially: BWXT, CCJ, CEG, DNN, GEV, LEU, LTBR, NNE, NXE, OKLO, plus 5 more.
Do Nuclear stocks move together?
The Nuclear theme has a 252-day average correlation of 0.60 across its members - decent co-movement. Editorial themes are narrative groupings, not capital-flow validated; tradability follows correlation, not the story.